← Completed Works
2. Etap Osmangazi Mahallesi Muhtelif Cadde ve Sokaklarına Beton Parke ve Bordür Kaplaması Yapım İşi
Completed
Transport Structures Afyonkarahisar 2018
- Contracting authority
- Afyonkarahisar Belediyesi
- Type of work
- Transport Structures
- Province
- Afyonkarahisar
- Status
- Completed
- Construction period
- 2018
- Contract date
- 16.07.2018
- Completion date
- 27.11.2018
- Contract duration
- 165 days
- Contract value
- 4,592,783.00 ₺
Record details are taken from the tender contract files. A copy of the authority-approved work completion certificate is supplied on request.
Site photographs
13 photos
Other works in the same field
Afyonkarahisar Municipality
2021
Karayolları Kavşağı Alt Geçit Yapım İşi
Completed · 13,690,000.00 ₺
Afyonkarahisar Municipality
2018
Atatürk Bulvarı Eski Stadyum Kavşağı Altgeçit Yapım İşi
Completed · 9,070,000.00 ₺
Antalya Metropolitan Municipality
2016
Düden Kavşağı ve Sakarya Kavşağı Arası Katlı Kavşak Yol Yapım İşi
Completed · 37,880,000.00 ₺
Afyonkarahisar Municipality
2017 – 2018
Seyfi Demirsoy Caddesi Köprülü Kavşak Yapım İşi
Completed · 9,240,000.00 ₺
Highways 13th Regional Directorate
2009
Kalkan – Fethiye 2. Bl. Hd. Yolu Kalkan Geçişi Toprak İşleri, Sanat Yapıları ve Üstyapı İşleri
Completed · 4,388,000.00 ₺
Antalya Organised Industrial Zone
2014 – 2015
AOSB III. Tevzi Alanı Yol ve Altyapı İnşaatı Yapım İşi
Completed · 11,416,000.00 ₺
08 / Contact
Let us share our qualification file.
If your authority needs a work completion certificate, technical personnel list or plant fleet undertaking for a construction work, fill in the form — our corporate team responds within the same working day.
Head Office — Antalya
Soğuksu Mah. 308 Sok. No:42Adabel Sit. B Blok 11/38
Muratpaşa / ANTALYA — TÜRKİYE +90 242 238 40 75
Regional Office — Afyonkarahisar
Güvenevler Mah.Kocatepe Cad. No:45
Merkez / AFYONKARAHİSAR — TÜRKİYE +90 272 216 94 53