Public infrastructure and building contracting · since 1997 +90 242 238 40 75  ·  info@ilba.com.tr
← Completed Works

Korkuteli İçmesuyu Temini ve Enerji Üretim Tesisleri Altyapı İnşaatı Yapım İşi

Completed Potable Water Transmission and Networks Antalya 2018 – 2019
Contracting authority
Antalya Su ve Atıksu İdaresi Genel Müdürlüğü (ASAT)
Type of work
Potable Water Transmission and Networks
Province
Antalya
Status
Completed
Construction period
2018 – 2019
Contract date
14.12.2018
Completion date
14.07.2020
Contract duration
120 days
Contract value
17,370,000.00 ₺

Record details are taken from the tender contract files. A copy of the authority-approved work completion certificate is supplied on request.

4 photos
08 / Contact

Let us share our qualification file.

If your authority needs a work completion certificate, technical personnel list or plant fleet undertaking for a construction work, fill in the form — our corporate team responds within the same working day.

Head Office — Antalya

Soğuksu Mah. 308 Sok. No:42
Adabel Sit. B Blok 11/38
Muratpaşa / ANTALYA — TÜRKİYE
+90 242 238 40 75

Regional Office — Afyonkarahisar

Güvenevler Mah.
Kocatepe Cad. No:45
Merkez / AFYONKARAHİSAR — TÜRKİYE
+90 272 216 94 53
Bid / document request

Request information on this work: Korkuteli İçmesuyu Temini ve Enerji Üretim Tesisleri Altyapı İnşaatı Yapım İşi

Form data is processed solely to respond to your request.