← Completed Works
Kütahya (Merkez) Yağmursuyu İnşaatı İşi
Completed
Stormwater and Drainage Kütahya 2015 – 2016
- Contracting authority
- Kütahya Belediyesi Su ve Kanalizasyon İşleri Müdürlüğü (İLBANK)
- Type of work
- Stormwater and Drainage
- Province
- Kütahya
- Status
- Completed
- Construction period
- 2015 – 2016
- Contract date
- 04.05.2015
- Completion date
- 03.07.2016
- Contract duration
- 420 days
- Contract value
- 8,298,000.00 ₺
Record details are taken from the tender contract files. A copy of the authority-approved work completion certificate is supplied on request.
Site photographs
10 photos
Other works in the same field
Antalya Water and Wastewater Administration (ASAT)
2016
Muratpaşa İlçesi Turgut Reis – Tonguç – Yıldız Cd. Yağmursuyu Drenaj Hattı İnşaatı Yapım İşi
Completed · 18,298,000.00 ₺
Antalya Water and Wastewater Administration (ASAT)
2015 – 2016
Kepez İlçesi Varsak 1. Etap Yağmur Suyu Drenaj Hatları Yapım İşi
Completed · 14,849,260.00 ₺
08 / Contact
Let us share our qualification file.
If your authority needs a work completion certificate, technical personnel list or plant fleet undertaking for a construction work, fill in the form — our corporate team responds within the same working day.
Head Office — Antalya
Soğuksu Mah. 308 Sok. No:42Adabel Sit. B Blok 11/38
Muratpaşa / ANTALYA — TÜRKİYE +90 242 238 40 75
Regional Office — Afyonkarahisar
Güvenevler Mah.Kocatepe Cad. No:45
Merkez / AFYONKARAHİSAR — TÜRKİYE +90 272 216 94 53